....
HDPE Pipe Extrusion Line is mainly used in the production of agricultural water supply and drainage, construction and drainage, and engineering cable laying. The production line is composed of extruder ,mold ,vacuum forming tank, spray cooling tank, tractor, cutting machine, turning frame, etc.
The extruder and tractor adopt frequency conversion speed regulation. According to the pipe specifications, the hauling machine has two-claw, three-claw, four-claw, six-claw, eight-claw, ten-claw and other hauling modes. The cutter can choose saw blade cutting, chipless cutting, or planetary cutting. The cutting machine adopts PLC control may reach fixed length cutting. For 16-110mm pipe customers, manufacturer usually choose a winder/coiling machine to pack the pipe.
Model | Pipe range(mm) | Extruder model | Co-extruder model | Linear Speed(m/min) | Max.ouput(kg/h) | Total power(kw) |
GLSJ-63 | 16-63 | SJ-65/33 | SJ-25 | 0.2-16 | 120 | 65 |
GLSJ-110 | 20-110 | SJ-65/33 | SJ-25 | 0.2-20 | 220 | 115 |
GLSJ-160 | 63-110 | SJ-75/33 | SJ-25 | 0.2-6 | 300 | 160 |
GLSJ-250 | 75-250 | SJ-90/33 | SJ-25 | 0.2-5 | 400 | 200 |
GLSJ-400 | 160-400 | SJ-90/33 | SJ-25 | 0.2-2 | 550 | 250 |
GLSJ-500 | 200-500 | SJ-100/33 | SJ-25 | 0.1-1 | 700 | 300 |
GLSJ-630 | 355-630 | SJ-120/33 | SJ-30 | 0.1-1 | 900 | 420 |
GLSJ-800 | 400-800 | SJ-130/33 | SJ-30 | 0.1-0.8 | 1200 | 500 |
GLSJ-1200 | 800-1200 | SJ-150/33 | SJ-30 | 0.05-0.5 | 1400 | 650 |
GLSJ-1600 | 800-1600 | SJ-150/33 | SJ-30 | 0.05-0.5 | 1500 | 850 |
If you have other questions, please contact us
Send me your demands by email or whatsapp, we will get back recommend suitable project solution and quote accordingly.
We send detailed machine quotation to you, if you are satisfied, we will make contract for you. Payment terms: T/T, L/C
In some countries, we have agent. We have one-year warranty.
You are welcomed to ask authority agency to visit our factory and machine.
We can assign engineer to your factory to install the machine and offer training. Each year, if we have machine technical improvements, we will inform customer.
Our factory is located in Zhangjiagang city which is nearby Shanghai port, about 2.5 hours car driving. If you want to visit our factory, we can come to pick you up.
Copyright © 2022.ZHANGJIAGANG GREENLANDPLAST MACHINERY CO.,LTD All Rights Reserved
The email will be sent directly to our CEO Bruce